flange alignment system


Looking for a Flange Alignment System?
Please contact DHLC.

Flange misalignment during the installation of offshore wind turbine foundations or transition pieces can significantly impact installation efficiency, connection integrity, and project schedules. DHLC provides specialized technical solutions and on-site expertise to assess, correct, and resolve flange alignment challenges, helping ensure accurate fit-up and reliable installation.

Misalignment of flanges during the installation of offshore wind turbines could be caused by several reasons by example misalignment during placing or deformated flanges.

This can cause serious issues by example bolts that do not fit or shear load to the bolts.

  • A Safe soluation, only local load and working on low pressure
  • An Accurate solution, the load in the flanges is calculated and controlled by the process.
  • A fast solution, the alignment/shift of a complete tower TP/MP can be performed offshore under 1 hour. Making oval flanges round can be performed offshore in 3 hours.
  • A proven method, this method is succesfully used in several projects.
  • DNV approved.