Project
MPGT & MP Saddles
Van Oord
MPGT and MP Saddles
Up to 1800 metric tonnes
Production saddles: 3 months
For this client DHLC has provided a Monopile Guidance Tool (MPGT), for this design its is bolted on SPMTs, and custom Monopile Saddles. The saddles were designed as such that they could rotate upwards to create a free driving line for the SPMTs with MPGT during upending.
Metric tonnes
+
0
Monopiles
0
+
Diameter
0
m
You might also like
Other cases
Van Oord
DHLC has provided the rigging for all main installation lifts for the Cadelers Offshore Installation Vessel Wind Alley. Rigging up…
Van Oord
DHLC has provided the rigging for all main installation lifs for Van Oords Offshore Installation Vessel Boreas. Rigging up to…
Van Oord
The delivery of the jacket lifting tools for Orsted represents a significant achievement for the project and highlights the strength…
Van Oord
For this client DHLC has performed, on behalf of the offshore wind farm developer, a third party review on a…
Van Oord
With its large stock of specialized lifting equipment DHLC has provide the client both top and bottom monopile lifting tool…
Tagged MP Installation, Seafastening