Project
Lifting beam
Van Oord
Self alignment system
3500 Te
Production: 4 months
For this client DHLC has provided a lifting beam with a capacity of 3500mt.
The lifting beam could handle a tilt up to 5 degrees, bobbins to reduce slings friction and wear. Also misalignment between the left hand and right hadn side of the beam can be mitigated.
Metric tonnes
0
Te
tilt and side angle
0
deg
Production time
0
months
You might also like
Other cases
Van Oord
For this client DHLC has provided a Monopile Guidance Tool (MP bottom end) and custom made Monopile Saddles which could…
Van Oord
DHLC has provided the rigging for all main installation lifts for the Cadelers Offshore Installation Vessel Wind Alley. Rigging up…
Van Oord
DHLC has provided the rigging for all main installation lifs for Van Oords Offshore Installation Vessel Boreas. Rigging up to…
Van Oord
The delivery of the jacket lifting tools for Orsted represents a significant achievement for the project and highlights the strength…
Van Oord
For this client DHLC has performed, on behalf of the offshore wind farm developer, a third party review on a…
Van Oord
With its large stock of specialized lifting equipment DHLC has provide the client both top and bottom monopile lifting tool…
Tagged Lifting equipment