Project

Slings

Cadeler
Main Installation rigging
3500 Te
Production: 3 months

DHLC has provided the rigging for all main installation lifts for the Cadelers Offshore Installation Vessel Wind Alley. Rigging up to 4000 MBL and up to 70 meter.

All rigging was proofloaded by DHLC own testbench and a verification statement by DNV.

Metric tonnes
0 Te
length
0 m
production
0 months