Project
Slings
Cadeler
Main Installation rigging
3500 Te
Production: 3 months
DHLC has provided the rigging for all main installation lifts for the Cadelers Offshore Installation Vessel Wind Alley. Rigging up to 4000 MBL and up to 70 meter.
All rigging was proofloaded by DHLC own testbench and a verification statement by DNV.
Metric tonnes
0
Te
length
0
m
production
0
months
You might also like
Other cases
Van Oord
For this client DHLC has provided a Monopile Guidance Tool (MP bottom end) and custom made Monopile Saddles which could…
Van Oord
DHLC has provided the rigging for all main installation lifs for Van Oords Offshore Installation Vessel Boreas. Rigging up to…
Van Oord
The delivery of the jacket lifting tools for Orsted represents a significant achievement for the project and highlights the strength…
Van Oord
For this client DHLC has performed, on behalf of the offshore wind farm developer, a third party review on a…
Van Oord
With its large stock of specialized lifting equipment DHLC has provide the client both top and bottom monopile lifting tool…
Tagged Lifting equipment, Monopile Saddles