Project

Slings

Van Oord
Main Installation rigging
4000 Te
Production: 3 months

DHLC has provided the rigging for all main installation lifs for Van Oords Offshore Installation Vessel Boreas. Rigging up to 4000MBL and up to 80 meter for the FMUT, lifting beam and hydro hammer.

All rigging was proofloaded by DHLC own testbench and a verification statement by DNV.

Metric tonnes
0 Te
length
0 m
production
0 months
You might also like

Other cases